Video & Sound Production | Project 2


23/09/19 - 30/10/19 (Week 5-Week 6)
Yeo Ava (0340222)
Video & Sound Production
Project 2


Lecture 6
01/09/19

Today we're told to shoot a commercial-based video, between two, our group decided to pick the horror. Since our class is smaller, we decided to make a group of the whole class instead of splitting it into two groups.



Producer - Joe
Art Director - Zain
Assistant art director - Arletta
Director - Ryan
Assistant director - Ava
Actor - Qaezie/Zhang YiXiang
Camera - Ehti
Assistant camera - Melvin
Lighting - Jason/Ting
Sound - Alex/Nizam


Pre-Production
This is some behind the scenes pictures of our filming day.


Fig 1.1 Behind the scene 1

Fig 1.2 Behind the scene 2

Fig 1.3 Behind the scene 3

Fig 1.4 Behind the scene 4

Fig 1.5 Behind the scene 5

Fig 1.6 Behind the scene 6
Post-production
This stage is when we do the colour correcting, and audio editing. This is the progress picture of audio editing, reducing noise and putting footsteps.


Fig 1.7 Editing in Adobe Audition

Fig 1.8 Editing in Adobe Premiere Pro



Final Outcome


Comments

Popular posts from this blog

Advanced Typography | Exercises

Design Exploration | Projects

Advance Interactive Design | Final Project